Industrial pipe thicknesses follow a set formula,expressed as the "schedule number" as established by the American Standards Association (ASA) now re-organized as ANSI - the American National Standards Institute.Eleven schedule numbers are available for use:5,10,20,30,40,60,80,100,120,140,& 160.The most popular schedule,by far,is 40.Sch 5,60,100,120,& 140 have rarely,if ever been employed by myself in over 40 years as a practicing engineer.The schedule number is defined as the approximate value of the expression:
Schedule # = (1,000)(P/S)
Where,
P = the internal working pressure,psig
S = the allowable stress (psi) for the material of construction at the conditions of use.
For example,the schedule number of ordinary steel pipe having an allowable stress of 10,000 psi for use at a working pressure of 350 psig would be:
Schedule = (1000)(350/10,000) = 35 (approx.40)
This would be the proper schedule for welded joints and steel fittings but not for threaded connections and cast-iron or malleable-iron fittings.In practice,schedule 40 would be used for welded construction and Sch 80 (about 2x the computed value) for iron fittings.The higher schedule is required because of weaknesses the iron fittings and the metal lost in cutting the threads.
For all pipe sizes below 10",Sch 40 pipe is identical with what was once called "standard" pipe,and Sch 80 is identical with the former "extra-strong" pipe.There is no equivalent schedule number for "double-extra-strong" pipe,and Sch 160 is the only other weight in which pipe smaller than 4" is available.
Temperature has no direct bearing on the schedule,except as it either weakens (or strengthens) the material's allowable stress.Stainless steels (304ELC & 316ELC),for example yield a stronger allowable stress at the low temperatures near the cryogenic zone (-50 to -150 oF).Copper and Brass also exhibit the same behavior.I've used the rule of thumb that the softer the metal,the stronger it is at the lower temperatures.
Schedule # = (1,000)(P/S)
Where,
P = the internal working pressure,psig
S = the allowable stress (psi) for the material of construction at the conditions of use.
For example,the schedule number of ordinary steel pipe having an allowable stress of 10,000 psi for use at a working pressure of 350 psig would be:
Schedule = (1000)(350/10,000) = 35 (approx.40)
This would be the proper schedule for welded joints and steel fittings but not for threaded connections and cast-iron or malleable-iron fittings.In practice,schedule 40 would be used for welded construction and Sch 80 (about 2x the computed value) for iron fittings.The higher schedule is required because of weaknesses the iron fittings and the metal lost in cutting the threads.
For all pipe sizes below 10",Sch 40 pipe is identical with what was once called "standard" pipe,and Sch 80 is identical with the former "extra-strong" pipe.There is no equivalent schedule number for "double-extra-strong" pipe,and Sch 160 is the only other weight in which pipe smaller than 4" is available.
Temperature has no direct bearing on the schedule,except as it either weakens (or strengthens) the material's allowable stress.Stainless steels (304ELC & 316ELC),for example yield a stronger allowable stress at the low temperatures near the cryogenic zone (-50 to -150 oF).Copper and Brass also exhibit the same behavior.I've used the rule of thumb that the softer the metal,the stronger it is at the lower temperatures.
举一反三
已知函数f(x)=x,g(x)=alnx,a∈R.若曲线y=f(x)与曲线y=g(x)相交,且在交点处有相同的切线,求a的值和该切线方程.
我想写一篇关于奥巴马的演讲的文章,写哪一篇好呢?为什么好
奥巴马演讲不用看稿子.为什么中国领导演讲要看?
想找英语初三上学期的首字母填空练习……
英语翻译
最新试题
- 1一个多项式减去a的平方-b的平方等于a的平方+b的平方+c的平方这个多项式是
- 2把足量的铜粉投入到含H2SO4 2mol的浓硫酸中,得到气体体积在标准状况下为22.4L 这句话对吗?
- 3若tan(A+B)=2/5,tan(A-π/4)=1/4,则tan(B+π/4)等于多少?
- 4甲数比乙数的2/3少30,若乙数为x,则甲数用代数式代表为( ).
- 5填成语和谐后语
- 6甲、乙两个筑路队合修4000米长的一段路,修了10天,还剩500米.已知甲队平均每天修160米,乙队平均每天修多少米?
- 7公共场所防火巡查每2小时1次,是24小时巡查还是工作时间巡查?
- 8market group 英文定义
- 94x的平方=9怎么求x
- 10证明 61!+1可以被71整除
热门考点