题目
英语翻译
D Followingdetails must be furnished with thequotation:
1.Assembly,start up and training on site for all machine included in the price i.e.airticket,accommodation and food.
2.Localtransportation shall be provided by the customer.
3.FOBprices to be quoted
4.Numberof containers required.
5.Pricevalidity shall be not less than 90 days.
6.Deliveryperiod
7.PaymentTerms.
8.GuaranteePeriod shall be provided from the date of the commissioning of the machines.
9.Listof free spare parts to be provided which is required during the guarantee period.
10.All wire/cables required for connection of themachine from the control panel supplied by the machine supplier to be included.
11.Aftersales service provisions.
D Followingdetails must be furnished with thequotation:
1.Assembly,start up and training on site for all machine included in the price i.e.airticket,accommodation and food.
2.Localtransportation shall be provided by the customer.
3.FOBprices to be quoted
4.Numberof containers required.
5.Pricevalidity shall be not less than 90 days.
6.Deliveryperiod
7.PaymentTerms.
8.GuaranteePeriod shall be provided from the date of the commissioning of the machines.
9.Listof free spare parts to be provided which is required during the guarantee period.
10.All wire/cables required for connection of themachine from the control panel supplied by the machine supplier to be included.
11.Aftersales service provisions.
提问时间:2020-10-31
答案
D Following details must be furnished with the quotation:下列内容需提供报价:
1.Assembly,start up and training on site for all machine included in the price i.e.airticket,accommodation and food.所有设备的现场安装、启动和培训包含在报价中,飞机票、住宿和餐饮包含在内.
2.Local transportation shall be provided by the customer.当地交通由客户提供.
3.FOB prices to be quoted报价方式为FOB(离岸报价)
4.Number of containers required.集装箱的数量需求
5.Price validity shall be not less than 90 days.报价有效期不少于90天
6.Delivery period发货期
7.Payment Terms.付款条件
8.Guarantee Period shall be provided from the date of the commissioning of the machines.质保期从设备试运行开始算起.
9.List of free spare parts to be provided which is required during the guarantee period.必须提供在质保期内免费的备件清单
10.All wire/cables required for connection of the machine from the control panel supplied by the machine supplier to be included.包含所有从设备的控制面板的电线、接头有设备供应商提供
11.Aftersales service provisions.提供售后服务.
1.Assembly,start up and training on site for all machine included in the price i.e.airticket,accommodation and food.所有设备的现场安装、启动和培训包含在报价中,飞机票、住宿和餐饮包含在内.
2.Local transportation shall be provided by the customer.当地交通由客户提供.
3.FOB prices to be quoted报价方式为FOB(离岸报价)
4.Number of containers required.集装箱的数量需求
5.Price validity shall be not less than 90 days.报价有效期不少于90天
6.Delivery period发货期
7.Payment Terms.付款条件
8.Guarantee Period shall be provided from the date of the commissioning of the machines.质保期从设备试运行开始算起.
9.List of free spare parts to be provided which is required during the guarantee period.必须提供在质保期内免费的备件清单
10.All wire/cables required for connection of the machine from the control panel supplied by the machine supplier to be included.包含所有从设备的控制面板的电线、接头有设备供应商提供
11.Aftersales service provisions.提供售后服务.
举一反三
我想写一篇关于奥巴马的演讲的文章,写哪一篇好呢?为什么好
奥巴马演讲不用看稿子.为什么中国领导演讲要看?
想找英语初三上学期的首字母填空练习……
英语翻译
1,人们染上烟瘾,最终因吸烟使自己丧命.
最新试题
- 1男生与女生优势与劣势的文章
- 2以if开头的英语小故事,一定是虚构的
- 3I want to find foreigners who stay in Qingdao and can teach english in weekend.
- 4平行四边形的高增加2cm,底减少2cm,得到新平行四边形比原平行四边形的面积_.
- 5阅读各种书籍 英语怎么说
- 6然而,美国孩子的生活和中国孩子的是截然不同的.【英语翻译】
- 7问一道数学题我一直不明白,为什么?求求你们,帮帮忙!
- 8“enduring as the universe”是什么意思?
- 9已知直线l:xtana-y-3tanb=0的斜率为2,在y轴上的截距为1,则tan(a+b)=?
- 10基态原子的电子排布式
热门考点
- 1北半球和南半球哪个的面积大?
- 22.4:1.6=2/3 60:40=2/3 2.4:1.6=60:40也可以写成1.6/2.4=40/60什么意思
- 31点10分、3点48分、4点30、11点35分用英语怎么说,两种说法,
- 4the baby is sleeping.=the baby is __
- 5地球和月亮的距离是变大还是变小的,为什么?
- 6不溶与酸的盐
- 7计算:4+(-2)3×5 化简:9y-3(4y-2) 解方程:3x-0.5x=10 解方程:3(x-1)+16(2x-3)=-16
- 8相对原子质量和中子.质子.核外电子数的关系
- 9如果2a=2b,则a和b成什么比例
- 10鸡兔同笼 24个头 78条腿 鸡和兔各有几只?